Oldham Retaining Wall

Back to Projects

The five-year framework involved the removal and reconstruction of failed mass masonry dry stonewalls. The scheme was divided into twelve projects varying in value from £120,000 to £1.5 million. Atlantix construction commenced the framework as preferred sub contractor to Dew Pitchmastic. However from 2005 to 2007 we were promoted to principal contractor responsible for delivering the projects within time and budget.

The schemes involved the following work elements:

  • Traffic management set up
  • Demolition and excavation of the existing failed mass masonry wall
  • Batter stabilisation and sheet piling
  • Construction of reinforced concrete retaining wall
  • Masonry walling to retaining wall
  • Carriageway drainage and services
  • Kerbing
  • Resurfacing and white lining
  • Top soiling and landscaping