Llandudno Bewsey Substation

Warrington

Back to Projects

The scheme involved the following work elements:

  • Safe digging practices to locate live services for jointing of new cables
  • Demolition of existing control room floor and trenches
  • Construction of new control service trench and floor slabs
  • Core drilling of new ducts through control room walls
  • Construction of new reinforced transfer slabs and bund walls
  • Installation of aqua sentry bund pumps
  • Backfilling of jointing bays and transformer chippings
  • Installation of transformer palisade fencing
  • External works including flagging, kerbing, tarmacking, lockable bollard installation