Crookston A & B Substation

Glasgow

Back to Projects

  • Remove redundant switchgear.
  • Install roof steelwork supports.
  • Demolish buss section brick walls.
  • Saw cut floor, break out concrete and excavate floor slab.
  • Fix reinforcement, fix shutters and concrete switchgear pit.
  • Core drill and install steel pipes through the walls
  • Install switchgear support steelwork Below floor level Crookston B and above floor level Crookston A
  • Install the GRP flooring
  • Paint the walls and floor
  • External ducting.
  • Excavate and install the perimeter earth tape.
  • Building repair works
  • Install Roxtec cable sealing systems