- Remove redundant switchgear.
- Install roof steelwork supports.
- Demolish buss section brick walls.
- Saw cut floor, break out concrete and excavate floor slab.
- Fix reinforcement, fix shutters and concrete switchgear pit.
- Core drill and install steel pipes through the walls
- Install switchgear support steelwork Below floor level Crookston B and above floor level Crookston A
- Install the GRP flooring
- Paint the walls and floor
- External ducting.
- Excavate and install the perimeter earth tape.
- Building repair works
- Install Roxtec cable sealing systems